BlackCat Robotics
Operator Console
Live · 12:26Fleet health, open alerts, and technician dispatch — focused on the repair loop.
Action Center
1 critical · 2 other
Telemetry shows sustained motor heat and a sudden vibration jump on the right spray arm.
Agras-T50-03 · DJI Agras T50
Risk Score
86/100
Fleet Impact
One drone out of production until serviced. If it fails mid-mission, spray pattern becomes uneven and a full reload/recalibrate cycle is required.
Next Action
Ground the aircraft and swap the right spray arm impeller before the next mission. Inspect motor housing for debris ingress and re-run balance calibration. Monitor two post-service flights before returning to production.
Left knee torque variance exceeded baseline for the third time in 24 hours.
Atlas-7F4A · Boston Dynamics Atlas Gen 2
Risk Score
63/100
Fleet Impact
Robot can continue limited-duty operation if load is reduced. Full failure would stop the unit and require BD field service for actuator R&R (4+ hours).
Next Action
Reduce lift-heavy tasks until recalibration is completed. Schedule a technician visit within 12 hours. Capture an additional gait trace after the next shift to confirm trend.
Quarterly calibration window opens in 3 days.
Figure-02-09 · Figure 02
Risk Level
LOW
Fleet Impact
Minimal — calibration takes ~30 minutes and prevents drift-related quality issues.
Next Action
Schedule calibration during the next low-traffic window. Run a pre-calibration diagnostic to flag any emerging issues before the tech arrives.
Fleet Health
70%
Average health score across active robots in the customer fleet.
Critical Alerts
1
Issues that need immediate technician or operator attention.
Open Jobs
2
Dispatch jobs still open, assigned, en route, or onsite.
Acme Robotics
| Robot | Platform | Location | Health | Status |
|---|---|---|---|---|
| Agras-T50-03 | DJI Agras T50 | Lubbock County Farm Grid, TX | 43% | online |
| Figure-02-09 | Figure 02 | Mercedes Prototype Cell, AL | 87% | online |
| Atlas-7F4A | Boston Dynamics Atlas Gen 2 | BMW Plant Spartanburg, SC | 63% | online |
| Unitree-G1-11 | Unitree G1 EDU | Austin Test Lab, TX | 85% | online |
Live telemetry
Needs action
Impeller vibration spike
Knee actuator drift
Calibration reminder
Repair loop
2 active jobs · 1 critical alert · Last sync 12:26
In progress
Agras-T50-03
Atlas-7F4A